SOCHI OLYMPIC VILLAGE CENTER KITCHEN PROJECT SOCHI / RUSSIA
Employer: TRANSKOMSTROY LTD.
Construction Date: 2013 – 2014
Construction Area: 5.700 m²
The Kitchen project of Krasnaya Polyana Olympic village, designed to produce food for athletes and guests in the Sochi – 2014 Winter Olympics, is designed as Basement floor + 3 Floors and has a construction area of 5.700 m2. The Olympic Village Central Kitchen, whose interior design is equipped with the latest model kitchen equipment, has the capacity to prepare meals for 12,000 people a day.
Gentes Construction completed the project in a very short period of 3 months and delivered it to the Company, and was rewarded with a plaque of success by the Sochi 2014 Olympic Committee General Finance Partner Sberbank.